With 360° rotation and precision hydraulic controls, the tracked spider crane placed 8 panels (4,000kg total) into the narrow gap with millimeter accuracy in just 4 hours—cutting lifting time by 50% vs. manual methods. The team avoided cost...
With 360° rotation and precision hydraulic controls, the tracked spider crane placed 8 panels (4,000kg total) into the narrow gap with millimeter accuracy in just 4 hours—cutting lifting time by 50% vs. manual methods. The team avoided costly site modifications (like widening access routes) that standard cranes would have required, with zero damage to nearby structures or vehicles.
This project highlights why tracked spider cranes are essential for constrained spaces: they merge compact maneuverability, terrain adaptability, and precise lifting—making them the top choice for urban construction, renovation, and tight-site material placement.